What we do · Expansion Joints
The Thing That Is Always Leaking
Joints allow the structure to move, and they are the most heavily worked and shortest-lived element in a garage.
The structure, its age, and what you have noticed. If there is an engineer's report, send that instead — we will price what it identifies.
Exposed
A garage is a structure left outside for fifty years
Unit rates
Repair quantity is unknowable until it is opened
Parking
Where displaced cars go decides the whole program
Licensed
General contractor, licensed in the state of Florida
A failed joint damages what is below it
Every joint carries traffic and moves constantly with temperature. When one fails, water and chlorides pour directly onto the structure below — so a failed joint is not a leak, it is a machine for creating the concrete deterioration that costs far more to repair.
There is a second reason joints get deferred. They are narrow, they run across drive lanes, and a failing one looks like a maintenance item rather than a structural one. By the time the leak below is obvious enough to prompt action, the concrete under the joint has usually been taking chloride-laden water for years.
Why joints fail
- Constant movement combined with constant traffic loading.
- Ultraviolet and heat degrading the sealing element.
- Debris packed into the joint, preventing movement.
- Poor original installation at the ends and terminations.
- Deferred replacement, long past service life.
Why the ends fail first
A joint has to be terminated where it meets a wall, a curb or another joint, and those terminations are where the geometry is most awkward and the installation most likely to be compromised. Water finds the end of the joint long before it finds the middle.
That is also why a joint repair that patches the middle and leaves the terminations alone fails quickly. The detail at each end is the part that needs the most attention and is the part most often rushed.
How we handle it
- 01Assess joints as a system, not one leak at a time.
- 02Remove the existing joint completely.
- 03Repair the concrete at the joint edges, which is usually damaged.
- 04Install the specified system, correctly terminated.
- 05Detail the ends properly, since that is where they fail.
Replace joints before they cause concrete damage rather than after. Joint replacement is comparatively cheap; the concrete restoration a failed joint causes underneath it is not, and the sequence is entirely within the owner's control.
Said plainly
Where we stop
A joint installed into deteriorated concrete edges will fail early. We repair the edges first, which adds cost and is the difference between a joint that lasts and one that does not.
FAQ
Common questions
- Why do joints fail so often?
- Constant movement and constant traffic, plus heat and ultraviolet. They are the shortest-lived element.
- Is a leaking joint urgent?
- It is pouring water and chlorides onto the structure below. It creates the expensive damage.
- Where do joints fail first?
- At the ends and terminations, almost always.
- Can we replace just the seal?
- Not if the concrete edges have deteriorated. It will fail early.
The practical side
Displaced Parking
parking garage repair where do cars go phasing
Read more →
Phasing
parking garage repair phasing occupied building
Read more →
Inspection
parking garage inspection engineer assessment condition
Read more →
Budgeting
parking garage restoration budget reserve cost
Read more →
The Cost of Deferring
defer parking garage repair cost consequences
Read more →
Next step
Find out what is actually wrong with it.
An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.